Travelodge

Downwell was appointed to deliver complex enabling works within a live data facility, creating a safe and operationally ready environment for the incoming main contractor. The scope included asbestos surveys and removal, full structural demolition, isolation of redundant services, and installation of new service routes to support future construction phases. Operating in a sensitive location with UXO risks and proximity to a dock wall, our team implemented rigorous safety protocols and excavation controls. This project demonstrates our capability to manage high-risk enabling works efficiently and in full compliance with client and regulatory standards.

Scope

The project will create a safe, secure and operationally ready environment for the incoming main contractor. The enabling works are complex and multifaceted, particularly given the live nature of the data facility. Key elements include:

  • Completion of a pre-commencement asbestos Refurbishment and Demolition (R&D) survey
  • Safe removal and disposal of all identified asbestos-containing materials
  • Full structural demolition of existing buildings and infrastructure
  • Identification, isolation and removal of redundant services
  • Installation of new service routes to support forthcoming construction phases
  • Coordination of all activities in line with client and regulatory safety standards

Challenges and Expertise

The site’s location within a historically bombed area of London introduced potential UXO risks and proximity to an existing dock wall. Downwell’s pre-construction team undertook detailed archival research and ground probing to assess these hazards. Additional banksmen and strict excavation controls ensured all works were executed safely, methodically and without incident.

Outcome

The works have been delivered safely and efficiently, providing the client with a cleared and compliant site ready for the next stage of development.